Production lead time: from artwork to a finished batch

Matrix Pack16 August 20265 min read
A finished Matrix Pack pouch with a valve for coffee

The question customers ask most often is a simple one: when will it be ready. The answer depends on a few things, but the benchmark is clear, a standard lead time of 7 to 14 days from artwork approval. Let us look at the stages that make up production and what affects the speed.

In short

Making a pouch goes through several stages: artwork, print preparation, printing, lamination and forming into finished pouches. The standard lead time is 7 to 14 days from artwork approval. The speed depends on the run size, the number of colours, the film structure and how quickly you approve the design. Artwork development is free.

What makes up the lead time

A lead time is not a single action but a chain of stages, each with its own timing. The more complex the product, for example multicolour print on a barrier laminate with a spout, the more steps there are and the longer the total time. A simple pouch in 1 or 2 colours without extra options comes out faster.

The stages of production

Artwork and approvalWe create or refine the design and agree the colours and layout with you
Print preparationWe prepare the printing plates or files for the chosen print technology
PrintingWe print the film in your colours, from 1 to 9 inks
LaminationWe bond the film layers to reach the required barrier and strength
Forming the pouchesWe cut the film and form pouches with a welded bottom, seams and options

After that the batch passes quality control and heads to you. Delivery across Ukraine is free for orders from the minimum quantity.

What affects the lead time

  • Run size: a larger volume needs more time for printing and forming.
  • Number of colours: more inks mean longer preparation and printing.
  • Film structure and options: a barrier laminate, valve, spout or zip-lock add steps.
  • Artwork readiness: if the design already exists and is approved quickly, the start comes sooner.
  • Production workload: during peak periods the queue can be tighter.

How to speed up production

What usually eats the most time is not the printing itself but the approvals. So it is best to prepare the artwork in AI, CDR or PDF format in advance and approve the colours quickly. If you have a deadline, tell us right away: for simple orders the lead time can often be shortened, and production planned around your date. We develop the artwork for free, and it usually takes a few business days. Tell us about the product, run size and target date, and we will give an exact lead time for your order.

Need a lead time for your order?

Tell us the product, run size and date, and we will give an exact lead time. Design development is free.

Frequently asked questions

How long does pouch production take?
The standard lead time is 7 to 14 days from artwork approval, depending on the run size, print complexity and film structure.
What does the lead time depend on?
On the number of print colours, the film type and options such as a zip-lock, valve or spout, as well as the production workload and how quickly the artwork is approved.
Can it be done urgently?
Often yes, for simple orders the lead time can be shortened. It is best to agree the deadline in advance, then we plan production around your date.
How long does artwork development take?
We develop the artwork for free, usually within a few business days depending on the design complexity and the number of revisions.